The HNL Runways and Taxiways Shoulder Rehabilitation is comprised of the reconstruction of runway and taxiway asphalt concrete shoulders of Runway 4R-22L and 4L-22R, and Taxiways B, C, D, E, and F. As part of the reconstruction, the existing intersection geometry was upgraded to meet current FAA design standards. The project also includes the complete reconstruction of taxiway C in between Runway 22L and 22R with new PCC pavement.

KEY COMPONENTS

  • Geotechnical Investigations
  • Topographic Survey
  • Pavement Design
  • AC and PCC Pavement Reconstruction
  • Geometry Layout
  • Grading & Drainage
  • Permitting
  • FAA Advisory Circular Compliance
  • Airfield Lighting
  • FAA Flight Check Coordination
  • Construction Safety & Phasing
  • Safety Risk Assessment